Skip to content
  1. Home
  2. Garbage Chute
  3. Garbage Chute Fire Sprinklers and Flushing Heads
Garbage Chute component / Izmir factory

Garbage Chute Fire Sprinklers and Flushing Heads made in our own factory

We manufacture the Garbage Chute Fire Sprinklers and Flushing Heads in our Izmir factory as one of the 13 components of the Kapella Garbage Chute.

  • Made in our Izmir factory
  • Part of the complete Garbage Chute
  • ISO 9001 · CE · TSE
Garbage Chute Fire Sprinklers and Flushing Heads Garbage Chute · 8 of 13
Garbage Chute Fire Sprinklers and Flushing Heads One of 13 components of the Garbage Chute.
Overview

About the Garbage Chute Fire Sprinklers and Flushing Heads

At Kapella, we prioritize the security and optimal functionality of your waste disposal systems, and our Fire Sprinklers and Flushing Heads are no exception. These essential components are designed with a focus on both fire security and efficient sanitation to ensure the reliability of your chute systems.

A. Fire Security

Our fire sprinklers are strategically positioned on each floor of your building, enhancing fire security and safeguarding the entire chute system. These fire sprinklers act as a crucial safety feature, mitigating potential fire hazards within the chute. Additionally, we incorporate a fire cut-off door at the bottom of the chute, serving as an added layer of protection. Our intelligent chute systems can seamlessly interconnect with Building Management System (BMS) fire alarm systems, which, in the event of a fire, trigger an automatic system lockdown to contain the situation effectively.

B. Flushing System

The flushing system, an integral part of the chute system, consists of a solenoid valve, and dosage pump, working in conjunction with the Disinfectant & Sanitizing Unit. Together, they manage the water flow to all cleaning sprinklers located on each floor. The inclusion of disinfectant liquid on the top floor further enhances the sanitation of the chute system, promoting a hygienic environment.

With Kapella Fire Sprinklers and Flushing Heads, you can be confident in the safety and cleanliness of your building’s chute system. Our commitment to excellence and innovation ensures that your waste disposal systems meet the highest standards, creating a secure and sanitary space for all occupants.

For consultants and contractors

Technical information

Garbage Chute specification

Applies to every component of the Garbage Chute, including the Garbage Chute Fire Sprinklers and Flushing Heads.

Chute diameter
400-600mm for most housing; up to 1200mm for high output offices.
Calculation
Based on number of storeys, waste production and structural design. Our engineers calculate the correct size from your plans.
Duct construction
Galvanised steel or 304/316 stainless steel.
Hopper door
Self closing, fire rated. Equipped with electromagnetic locking and LED display.
Discharge
To wheeled bins, compactor or sorter.
Optional extra features
Fire rated auto hopper door, sanitizing unit, brush cleaning unit, ventilation fan and connections for compactors and sorters.

Garbage Chute · Fire rating

Doors
UL Classified (UL file reference GSPR.R41885).
EN fire rating
Tested by Efectis to EN standards for up to 120 mins.
Designed to comply with
NFPA 82, UL 10B, UL 555, BS 1703, EN 1634-1.
Included
Fire damper, fusible-link discharge door, sprinklers and flushing heads.
Quality assurance
ISO 9001, CE, TSE.
View certificates →
In the system

The Garbage Chute Fire Sprinklers and Flushing Heads and the rest of the Garbage Chute

13 components, made in our Izmir factory and supplied as one system.

See the complete Garbage Chute →
Manufacturer not a supplier

Our products are produced in house in our Izmir factory.

  • Production Hopper doors, duct, fire dampers and control panels. We also produce sorters.
  • Supplied Packed and labelled per floor.
  • Installation Our engineer is on site to both oversee and commission.
Arrange factory visit / video conference →
FAQ

Common queries relating to the Garbage Chute Fire Sprinklers and Flushing Heads

If your query is not listed below, please include it with your quotation request. One of our engineers will then respond to you directly.

Query an engineer
Who manufactures the Garbage Chute Fire Sprinklers and Flushing Heads?

Kapella manufactures the Garbage Chute Fire Sprinklers and Flushing Heads in its own factory in Izmir, Turkey, together with the other components of the Garbage Chute. Our quality management is certified to ISO 9001, and our products carry CE and TSE marking.

Can the Garbage Chute Fire Sprinklers and Flushing Heads be supplied for an existing chute?

Please send the chute diameter, the material and photos of the installation with your request. Our engineers will check the fit and reply with a quotation.

What information is needed for a quotation?

The chute diameter, the material and the quantity you need. For a new building, a section plan and the number of storeys are enough for us to plan the complete system.

Initiate project

Please send the chute diameter, the material and the quantity you need.

With this information our engineers can confirm the right Garbage Chute Fire Sprinklers and Flushing Heads for your chute and send you a detailed quotation.

  1. We calculate optimum chute, hopper door and fire damper size and discharge requirements for your property.
  2. You receive a detailed quotation together with plans for approval.
  3. We manufacture the garbage chute in our Izmir factory. It is then despatched floor by floor for installation, again with our engineer present to oversee this process.
Independently tested and certified
UL Classified Efectis CE ISO 9001 TSE
View certificates →